Replacement of steam and condensate in 26 federal buildings over the next 30 months. Currently: -National Museum of American History -The Department of the Interior South -The Office of Personnel Management (OPM) -The Winder Building |
|
HOTD Upgrade Phase I, Washington, DC (GSA) |
|
Replacing hot water and chill water pipes connecting the chiller and heat plants to 8 new manholes and several thousand feet of piping at Laurel campus for the FDA. |
|
FDA UG Piping Replacement, Laurel, MD (G-W Mgmt) |
|
The sixth phase of the ongoing NASA, Parsons, and CPF chill water and steam distribution endeavor. |
|
Site Steam Phase VI, Option 1 & 2, NASA Goddard Space Flight Center, Greenbelt, MD (Parsons) |
|
...And many smaller jobs, including (but not limited to) The Ellipse, The Treasury Building, The Court of Appeals, The Pension Building, all of which are downtown Washington, DC, and a part of the HOTD Distribution System. |

|
Replacing HTHW lines. |
|
Adelphi Army Research Laboratory HW Replacement , Adelphi, MD (Marrada) |



|