Installation of 4,426 lf. of steam and condensate with underground conduit . Contact: Paul Rosseau—(410) 247-9096
|
|
Design/build project. Installation of 2,859 lf. of steam and condensate pipes, with manholes, in a hand dug tunnel. Contact: Greg Westphal—(202) 690-9720 |
|
Installation of over 2,600 lf. of hot and chilled water underground conduit systems for new commercial development on the Baltimore Harbor. The project included conduit, manholes and associated piping from a new central energy plant to a new structure and piping for future structures. Additional work included the installation of nearly 800 lf. of telecom./electric duct banks with electric and comm.. manholes throughout and several hundred feet of condenser piping for the cooling tower. Engineers working on this project are Whitney, Bailey, Cox and Magnani with also Gipe and Associates.
Contact: Ron Melchoir—(410) 907-2021 |
|
Installation of 1500 lf. of large diameter 48” and 60” pipe , with vaults and manholes, in a campus environment.
Contact: Tom Blanchard—(301) 405-3373 |
|
Replace Mall Steam Pipe Loop, Naval Research Laboratory |
|
HW/CWS Piping Installation, Constellation Energy/Canton Crossing Plant |
|
Replace 10th Street Buried Lines, General Services Administration |
|
Paint Branch Road Storm Drain, University of Maryland |
|
Recently Completed Projects |

|
Installation of 5,500 lf. Of chilled water, steam, and condensate pipes. Contact: Jerry Eubanks—(703) 204-1400 |
|
Exploration Science Building, NASA/Goddard Space Flight Center |




|
Running steam, condensate, and chill water pipes to the new Space Exploration Building at NASA Goddard Space Flight Center with Manhatten Construction. |
|
NASA, Parsons, and CPF have installed several phases of their chilled water and steam distribution system over the last ten years. |
|
Site Steam Option 3 Roadway Loop, NASA Goddard Space Flight Center, Greenbelt, MD (Parsons) |
|
Exploration Science Building, NASA Goddard Space Flight Center, Greenbelt, MD (Manhatten) |
|
Demolition of a manhole, and repair of a pipe loop. |
|
HOTD Leak Repair, Pension Building, Washington, DC (EMCOR) |
|
From Paint Branch Road through to the softball fields, CPF is upgrading the older storm drains in order to prevent some of the buildings’ basements from flooding. |
|
University of Maryland College Park Storm Drain Upgrade, College Park, MD |




|
Home |
|
About CPF |
|
Key Personnel |
|
Maintenance |
|
Current Projects |
|
Recent Projects |
|
Picture Gallery |
|
Vacuum Excavation |
|
Apply to CPF |
|
Contact Us |


|
CPF Underground Utilities, Inc. 180 Jibsail Drive Prince Frederick, MD 20678 |
|
Replacing hot water and chill water pipes connecting the chiller and heat plants to 8 new manholes and several thousand feet of piping at Laurel campus for the FDA. |
|
FDA UG Piping Replacement, Laurel, MD (G-W Mgmt) |
|
Replacing HTHW lines. |
|
Adelphi Army Research Laboratory HW Replacement , Adelphi, MD (Marrada) |